Analyst Price Target is GBX 0
▼ -100.00% Downside Potential
This price target is based on 0 analysts offering 12 month price targets for Serabi Gold in the last 3 months. The average price target is GBX 0, with a high forecast of GBX 0 and a low forecast of £100,000. The average price target represents a -100.00% upside from the last price of GBX 128.
Current Consensus is
N/A
The current consensus among 0 investment analysts is to n/a stock in Serabi Gold. This N/A consensus rating has held steady for over two years.
Serabi Gold plc is a gold exploration and production company involved in the evaluation and development of gold deposits in Brazil. the Company's primary interests are its 100% owned Palito Mining Complex and the more recently acquired Coringa Gold Project both located in the Tapajos region of northern Brazil. The Palito Mining Complex includes over 50,800 hectares of contiguous and highly prospective exploration tenements that the Company controls, whilst the Coringa project forms part of a eight kilometre continuous strike of historic artisanal mine workings and includes seven separate concessions totalling over 13,000 hectares. Combined gold production from the Palito Mining Complex is currently approximately 40,000 ounces per annum, whilst the Coringa Project, when in production, is forecast to produce an average of 38,000 ounces per annum.
The Palito Mining Complex comprises the Palito and Sao Chico orebodies, which provide ore feed to a centralised 500tpd central processing plant.
Both mines are narrow vein underground mining operations with mined ore grades typically of between 7.000 g/t and 9.00 g/t being achieved. Mining at Palito uses shrinkage stoping whilst Sao Chico is a narrow vein longhole stoping operation.
The Company acquired the Coringa Project in December 2017 and is in the process of obtaining the necessary permits to commence development and construction of the plant which had been acquired by the previous owner. Coringa, which has an average Measured and Indicated Resource grade of 8.24 g/t, will be operated as a narrow vein, underground mining operation and therefore has significant operational similarities to the Company's existing mining operations.
Read More